Great to See You At CRWUA 2024
Innovation in Infrastructure
Elevating North American Water and Wastewater Pipelines Utilizing Fiberglass Reinforced Polymer Mortar (FRPM) Pipe
As the U.S. water and wastewater infrastructure faces the challenges of aging systems and underinvestment, the need for reliable, durable, long-lasting products has never been more critical.
Jeff LeBlanc, PE, Director of Project Development
Inspection and Repair Project
As you know, our country is facing increased challenges with aging water infrastructure, with a water main break every two minutes according to ASCE. We have experience helping cities and municipalities resolve these exact challenges.
Providence Water located in Cranston, RI utilized 90-inch diameter, 100 psi Hobas pipes to rehabilitate a PCCP pipeline on the 102-inch Supplemental Tunnel and Aqueduct Inspection and Repair Program Project.
Discover why so many professionals in the industry are choosing Hobas Fiberglass Reinforced Polymer Mortar (FRPM) pipe.
Connect to Learn More
If you have any specific questions regarding a project, topic, design, testing, and installation, please send them our way. Our engineering, production, quality control and field service departments will be happy to address them.
Here are two opportunities to learn more:
- Facility Tour: Get a front row seat to our manufacturing processes and witness how Hobas Pipe produces high-quality products. Schedule a tour of our facilities.
- Lunch-n-Learn: Elevate your industry knowledge while enjoying a catered lunch. Book a session with us and earn valuable CE credits during this informative session.
To schedule either of these opportunities, complete the form above.
Find out why more and more owners are selecting our leak free, corrosion resistant, long lasting, fiberglass-reinforced polymer mortar pipe.