Spiniello is nearing the completion of installing ~4500 LF of Hobas Non-Circular Pipe.
This project had very challenging installation conditions, including several railroad crossings, over 50 ft of cover, close proximity to the LA River, and over 7 curves some with as little as 40′ radius.
We congratulate Spiniello on another successful project with Hobas Pipe!