by Hobas Pipe | Apr 1, 2024 | Events
Hobas Pipe loves networking with other industry professionals at trade shows across the country (and around the world) to share our innovative technology and mission. We compiled a comprehensive list of April Trade Shows where Hobas Pipe and other incredible industry...
by Hobas Pipe | Feb 29, 2024 | Project updates
Hobas Pipe was selected for the Pine Street project designed to address water supply issues in the events of flooding in Beaumont communities. The project is in response to water supply issues that resulted from the breach of a pumping station during Hurricane Harvey...
by Hobas Pipe | Feb 27, 2024 | Press Release
New Brochure – Structural Manhole System Fiberglass Reinforced Watertight Structural Manhole System HOBAS Tee Base with Riser Section To meet your project design requirements, a new HOBAS tee basemanhole system is available with added features and size options. Read...
by Hobas Pipe | Feb 15, 2024 | Case Study, Look Back Series
In March 1992 Archer, Daniels, Midland Co. (ADM) diverted their effluent flow into their new Hobas line and quickly learned that only two of the three 100 HP pumps were needed. Shutting down one 100 HP pump saves 650,000 KWH per year; an annual electricity savings of...
by Hobas Pipe | Jan 15, 2024 | Video
Project Name: “Mt. Olivet Adit Tunnel for the Northeast Boundary Tunnel DC Water Clean Rivers” The Mt. Olivet Adit Tunnel is part of DC’s ongoing program to reduce combined sewer overflows into the districts waterway. The massive project includes...