by Hobas Pipe | Jun 11, 2024 | Case Study, Look Back Series
To celebrate Hobas Pipe’s continued expansion in 2024, Hobas Pipe is releasing a Look Back Series to review and re-publish case studies that cover our long history of exceptional service providing Pressure and Gravity to municipalities desiring sustainable water...
by Hobas Pipe | May 23, 2024 | Case Study, Project updates
Spiniello is nearing the completion of installing ~4500 LF of Hobas Non-Circular Pipe. This project had very challenging installation conditions, including several railroad crossings, over 50 ft of cover, close proximity to the LA River, and over 7 curves some with...
by Hobas Pipe | Feb 15, 2024 | Case Study, Look Back Series
In March 1992 Archer, Daniels, Midland Co. (ADM) diverted their effluent flow into their new Hobas line and quickly learned that only two of the three 100 HP pumps were needed. Shutting down one 100 HP pump saves 650,000 KWH per year; an annual electricity savings of...
by Hobas Pipe | Jan 11, 2024 | Case Study, Look Back Series
To celebrate Hobas Pipe’s continued expansion in 2024, Hobas Pipe is releasing a Look Back Series to review and re-publish case studies that cover our long history of exceptional service providing Pressure and Gravity to municipalities desiring sustainable water...
by Hobas Pipe | Jan 3, 2024 | Case Study, Look Back Series
In 1987, Hobas Pipe’s fiberglass pipe factory was completed in Houston and began supplying the U.S. market with installations throughout Texas, including Houston, Corpus Christi and Odessa. Kimberly Paggioli, P.E., Vice President of Engineering comments, “West...